This is the Change Management Plan for the week of 24-30 Sept 2010.
System: Cat Tracks
Purpose of Change: Upgrade to 4.0.7 Risk: Not being on the most current version and losing functionality Roll Back Plan: rolling back to the previous version from cold backup taken prior to the upgrade DateTime: Saturday, 9/25/2010 starting at 1:00 am for cold backup actual upgrade will begin at 7:00 am. Cat Tracks is not a 24/7 system, can be down outside of the maintenance window. Outage Length: 5 hours for cold backup and 4 hours for actual upgrade, Cat Tracks should be available by 11:00 am on Saturday 9/25/2010. Performed by: Van Nguyen System: Banner
Purpose of Change: Migrate Flex-Reg to production Risk: unable to clone test systems from PROD without wiping out current installation and also not being able to meet the Flex-Reg go live date. Roll Back Plan: Roll back to backup taken prior to begining install. Date and Time: Sunday 09/26/2010 6:00 am Outage Length: 4 hours Performed by: Van Nguyen This is an emergency
change:
System: Cisco ACE Load balancer
Purpose of Change: Replace defective unit with replacement unit. All TE data center network traffic will be down
during replacement. This includes servers in the Academic co-location data
center except Library servers.
Risk: Device could reboot automatically to clear memory errors. Roll Back Plan: Put old device back in service. DateTime: Sunday, Sept 26th, 2010 2 am Outage Length: 1hr _______________________________________________________________________________________________ |
|
These are additions to the change management plan for the week of 24 to 30
Sept 2010
System: PT Wired and Wireless networks
Purpose of Change: Replace out of support switches with switches that are still supported. Upgrade building router to the latest code version. Risk: Unsupported switches remain on the network posing a security risk. Roll Back Plan: Reinstall old switches and code. Date and Time: Wednesday September 29, 2010 5:00pm Outage Length: 1 Hour Performed by: Luke Jenkins and other NCIS members System: selfservice.weber.edu
Purpose of Change: Move DNS to new Load Balancer Risk: Can't move forward with WebTailor 8.3 upgrade. Roll Back Plan: Change DNS back. Date and Time: Sun Sept 25th 2am Outage Length: none Performed by: Jonathan Karras _______________________________________________________________________________________________ |
|
This is the Change Management Plan for the week of 1 - 7 Oct 2010
System:GroupWise Rho Post Office (tentative)
Purpose of Change:Data of Rho Post office migrating to AMS 2500 Risk:Data stays on xRaid Roll Back Plan:Start the PO back on Netware Date and Time:Saturday Oct 2nd 10:00PM - 5:00 AM Outage Length: 6 hrs Performed by:Gursharan Bakshi System:Banner Self Service
Purpose of Change:Move Web Tailor 8.3 New Look and Feel to production. Risk: Old Look and Feel. Roll Back Plan:rollback to Old Look and Feel.Date and Time:Sunday Oct 3, at 7 a.m. Outage Length:3 hours from 7:00 a.m to 10:00 a.m. Performed by:Van Nguyen _______________________________________________________________________________________________ |
| This is the Change Management Plan for the week of 8-14 Oct 2010 System: Davis Campus Data Center Purpose of Change: Addition of power supplies and monitors in preparation for moving DR test equipment to the Davis Campus Risk: None Roll Back Plan: None Date and Time: 11 Oct 2010 Outage Length: None Performed by: Heidi Munk _______________________________________________________________________________________________ |
| This is an addition to the Change Management Plan for the week of 8-14 Oct
2010 System: Banner Financial Aid Purpose of Change: Upgrade from 8.7 to 8.8 INB and Self-Service modules Risk: not able to package students correctly Roll Back Plan: Roll back to 8.7 Date and Time: 10/10/10 8:00 am Outage Length: 1.5 hours Performed by: Mark Green _______________________________________________________________________________________________ |
| Addtition to Change Management Plan for the week of 8-14 Oct 2010 System: Gamma Post Office Purpose of Change: Gamma Post Office Data will me migrated to AMS 2500 and server OS will be changed to Linux. Risk: Data staying on old xraid Roll Back Plan: Start Gamma PO back on Netware Date and Time: 10/9/2010 - Saturday 9:00 PM - Sunday 5:00 AM Outage Length: 5-6 Hrs Performed by: Gursharan Bakshi _______________________________________________________________________________________________ |
|
This is an Emergency Change Management Plan for 11 Oct 2010
System: Netdrive1 & 2, Network shared files on the Forest
Purpose of Change: To rebuild failed volumes and upgrade OS and OES versions to prevent more failures Risk: The shared drives are currently not available and will not be available until the work is complete. Roll Back Plan: none Date and Time: 11 Oct 2010 16:36 Outage Length: Unknown Performed by: Edd Ramer _______________________________________________________________________________________________
|
|
This is an Emergency Change Management Plan for 12 Oct 2010
System: Netdrive1 & 2, Network shared files on the Forest
Purpose of Change: Finish upgrade to OS and OES on Netdrive1 Risk: Corruption of data Roll Back Plan: None Date and Time: 12 Oct 2010, 9:00 PM Outage Length: 3-5 Hours Performed by: Edd Ramer _______________________________________________________________________________________________ |
|
This is the Change Management Plan for the week of 15-21 Oct 2010:
System: Davis Data Center
Purpose of Change: Complete the rack power and networking and cable management for the Data Center at the Davis Campus Risk: Accidental unplugging of servers while doing cable management, short
network outage while cables are being moved.
Roll Back Plan: Plug the server or network cable back in. Date and Time: Oct 15 2010 9:00am to 5:00 pm This is the day of Fall Break so student impact should be minimal. Outage Length: 8 hours
Performed by: Heidi Munk System: (Tentative) GroupWise Kappa PO & Omega PO
Purpose of Change: Move the Data from these 2 post offices to AMS 2500 and change OS of the server to SLES 10 SP 3 Risk: Data residing on old xraid Roll Back Plan: Start back on old Netware server. Date and Time: Saturday 9:00 PM - Sunday 7:00 AM Outage Length: 8 hrs Intermittent Performed by: Gursharan Bakshi System: MS SQL 2005 Dev, MS SQL 2005 Prod, Appshare and WSUImages (Site
Manager)
Purpose of Change: Move files to new storage Risk: Running on old hard drives has higher risk of failure
Roll Back Plan: Revert to old storage DateTime: Oct 17th 2:00AM-10:00AM Outage Length: 8 hours Services Impacted: part of the outage ChiTester, Blackberry, Citrix,
Helpdesk, Zenwoks, Master Cal., All in house web development, Continuing
Education, CMS, CLM, EMS , EMAS, and many more servers.
Performed by: Mark Buxton and David Fernelius System: Xtender
Purpose of Change: Move files to new storage Risk: Running on old hard drives has higher risk of failure
Roll Back Plan: revert to old storage DateTime: Oct 17th 2:00AM-10:00AM Outage Length: 8 hours Services Impacted: part of the outage ChiTester, Blackberry, Citrix,
Helpdesk, Zenwoks, Master Cal., All in house web development, Continuing
Education, CMS, CLM, EMS , EMAS, and many more servers.
Performed by: Mark Buxton and David Fernelius _______________________________________________________________________________________________
|
|
This is the change management plan for the week of 22-28 Oct 2010.
System:(Tentative) GroupWise Beta PO & Sigma PO
Purpose of Change:Move the Data from these 2 post offices to AMS 2500 and change OS of the server to SLES 10 SP 3 Risk:Data residing on old xraid Roll Back Plan:Start back on old Netware server. Date and Time:Saturday 23 Oct 9:00 PM - Sunday 24 Oct 7:00 AM Outage Length:8 hrs Intermittent Performed by:Gursharan Bakshi _______________________________________________________________________________________________
|
|
This is the Change Management Plan for the week of 29 Oct to 4 Nov
2010.
System: GroupWise Beta Post Office / Grpwise1vs
Purpose of Change: Move the Data of Beta Post Office and Grp1 Domain to AMS2500. Move the OS to Linux. Risk: Data staying on xRaid Roll Back Plan: Run it on NetWare Date and Time: Saturday 10/30/10 - 9:00 PM - 6:00 AM Outage Length: 5 hrs Intermittent Performed by: Gursharan Bakshi _______________________________________________________________________________________________
|
|
This is the Change Management Plan for the week of 5-11 Nov 2010:
System: Banner Financial Aid
Purpose of Change: Upgrade from 8.8 to 8.8.1 Risk: Not able to upgrade to 8.9 until 8.8.1 has been applied Roll Back Plan: roll back to 8.8 Date/Time: November 7th 7:00 am Outage Length: one hour Performed by: Mark Green System: Degree Works
Purpose of Change: Upgrade Oracle from 10g to 11g Risk: being on older version of Oracle Roll Back Plan: Restore from backup taken before starting the upgrade Date/Time: November 7th 7:00 am Outage Length: 3 hours Performed by: Van Nguyen System: GroupWise Campus Domain
Purpose of Change: Change Campus Primary GroupWise Domain to AMS 2500 as well as change operating system to SLES. Risk: Data staying on X-Raid/Netware server Roll Back Plan: Start it back on Netware Server. Date/Time: Saturday 11/06/10 - 9:00 PM Outage Length: 4 hours - (user impact -none) (mail will be delayed going out) Performed by: Gursharan Bakshi _______________________________________________________________________________________________ |
|
This is the Change Management Plan for the week of 12 to 18 Nov 2010
This notification is a Tentative notification. It is
subject to a go no go and might not happen.
System: Banner Financial Aid
Change: Possible upgrade of Banner Fin Aid from 8.8.1 to 8.9 and then to
8.9.1. Testing will continue thru Friday afternoon, if no problem we will do
the upgrade.
Risk: Running on older version, SunGuard consultant will be here next week
to train on new versions.
Roll Back: Revert back to version 8.8.1
Date: November 14th 6:00 AM
Length of Outage: Four hours
Work done by: Mark Green
_______________________________________________________________________________________________
|
|
This is the revised Change Management Plan for the week of 12 to 18 Nov
2010.
This notification is a Tentative notification. It is
subject to a go no go and might not happen.
System: Banner Financial Aid
Change: Possible upgrade of Banner Fin Aid from 8.8.1 to 8.9 and then to
8.9.1. Testing will continue thru Friday afternoon, if no problem we will do
the upgrade.
Risk: Running on older version, SunGuard consultant will be here next week
to train on new versions.
Roll Back: Revert back to version 8.8.1
Date: November 14th 6:00 AM
Length of Outage: Four hours
Work done by: Mark Green
System: Wireless Network
Change: Change authentication (RADIUS) server for wireless to a new redundant RADIUS server configuration in TE Data Center and Davis Data Center. Risk of Not Performing: RADIUS authentication for wireless remains on a single server. Roll Back Plan: Move back to original RADIUS server. Time of Change: Sunday, Nov 14, 2010 @ 6am Length of Outage: none Work Performed by: NCIS _______________________________________________________________________________________________
|
|
This is the Change Management Plan for the week of 19 -25 Nov 2010.
System: Eweber Portal
Change: We are moving Eweber from the old load-balancer (CSS) to the new
load-balancer (ACE).
Risk of not performing maintenance: The old load-balancer is going to be
decommissioned in the near future. Additionally, the new load-balancer provides
more features.
Roll Back Plan: Change DNS entry for eweber.weber.edu to direct users to
the old service location.
Date and Time: 6:00 AM on Sunday, November 21, 2010
Expected Length of Outage: 30 minutes while DNS is synchronized
Work performed by: Tristan Rhodes
System: Workflow Production
Change: Database 11g (11.1.0.7) upgrade
Risk of not performing maintenance: None
Roll Back Plan: Restore from Database 10g version.
Date and Time: 21 Nov 2010 midnight
Expected length of Outage: 10 hours
Work performed by: Van Nguyen
19 Dec 2010
In conjunction with the installation of electrical meters that Facilities
Management, IT Infrastructure will be switching the Data Centers in Technology
Education to generator power. The Data Center will run on generator power from
midnight to 2 am. We do not anticipate any disruption of University Services
during this time. If you have questions, please feel free to call me.
______________________________________________________________________________________________
|
|
This is the Change Management Plan for the week of 3 - 9 Dec 2010
Purpose of Change: Upgrade UC4 production database to Oracle
11g
Services Affected: UC4 Risk: Reaching end of support on 10g databases Roll Back Plan: roll back to backup of 10g database Date and Time: Saturday December 4th 7:00 AM - 10:00 AM Outage Length: 3 hours Performed by: Van Nguyen System: AiM (FM)
Purpose of Change: Upgrade AiM production database to Oracle 11g Services Affected: AiM Risk: Reaching end of support on 10g databases Roll Back Plan: roll back to backup of 10g database Date and Time: Sunday December 5th 12:00 AM - 10:00 AM Outage Length: 10 hours Performed by:Van Nguyen 19 Dec 2010
In conjunction with the installation of electrical meters that Facilities
Management, IT Infrastructure will be switching the Data Centers in Technology
Education to generator power. The Data Center will run on generator power from
midnight to 2 am. We do not anticipate any disruption of University Services
during this time.
_______________________________________________________________________________________________
|
|
EMERGENCY CHANGE MANAGEMENT MESSAGE
System: Eweber portal (eweber.weber.edu)
Purpose of Change: Change DNS to send users directly to Macyn (137.190.9.91), rather than going through the load-balancer (137.190.8.17). Services Affected: Eweber portal (eweber.weber.edu) Risk: Some users are getting an error ("cp/home/next")that prevents them from using Eweber. Roll Back Plan: Change DNS back to the load-balancer VIP (137.190.8.17) Date and Time: 5:00 PM, Friday, December 3rd Outage Length: No outage expected, users will migrate to new location within an hour. Performed by: Tristan Rhodes 19 Dec 2010
In conjunction with the installation of electrical meters that Facilities
Management, IT Infrastructure will be switching the Data Centers in Technology
Education to generator power. The Data Center will run on generator power from
midnight to 2 am. We do not anticipate any disruption of University Services
during this time.
_______________________________________________________________________________________________
|
|
This is the Change Management Plan for the week of 3 - 9 Dec 2010
System: Eweber portal (eweber.weber.edu)
Purpose of Change: Change DNS to send users back through the load-balancer. Also change sticky method to "cookie insertion". (Previous method was "source-IP") Services Affected: Eweber portal (eweber.weber.edu) Risk: Some users are getting an error ("cp/home/next")that prevents them from using Eweber. Roll Back Plan: Change DNS back to Macyn. Date and Time: 4:00 AM, Sunday, December 5th Outage Length: No outage expected, users will migrate to new location within an hour. Performed by: Tristan Rhodes Purpose of Change: Upgrade UC4 production database to Oracle
11g
Services Affected: UC4 Risk: Reaching end of support on 10g databases Roll Back Plan: roll back to backup of 10g database Date and Time: Saturday December 4th 7:00 AM - 10:00 AM Outage Length: 3 hours Performed by: Van Nguyen System: AiM (FM)
Purpose of Change: Upgrade AiM production database to Oracle 11g Services Affected: AiM Risk: Reaching end of support on 10g databases Roll Back Plan: roll back to backup of 10g database Date and Time: Sunday December 5th 12:00 AM - 10:00 AM Outage Length: 10 hours Performed by:Van Nguyen _______________________________________________________________________________________________
|
|
This is an emergency Change Management Plan:
System: Eweber portal (eweber.weber.edu)
Purpose of Change: Change DNS to send users back through the load-balancer. Also change sticky method to "cookie inspection". (Previous method was "source-IP") Services Affected: Eweber portal (eweber.weber.edu) Risk: Some users are getting an error ("cp/home/next")that prevents them from using Eweber. Roll Back Plan: Change DNS back to Macyn. Date and Time: 2:00 AM, Tuesday, December 7th Outage Length: No outage expected, users will migrate to new location within an hour. Performed by: Tristan Rhodes 19 Dec 2010
In conjunction with the installation of electrical meters that Facilities
Management, IT Infrastructure will be switching the Data Centers in Technology
Education to generator power. The Data Center will run on generator power from
midnight to 2 am. We do not anticipate any disruption of University Services
during this time.
_______________________________________________________________________________________________
|
|
The following notice was sent out by Cory Cunningham:
Due to complications with Sungard software and Oracle 11g, UC4 Production
was backed down to 10g yesterday, as well as Banner BTST. We will be backing UC4
Test back to 10g as well. Please confirm that all work in UC4 Test has been
copied/saved.
The upgrade will be attempted again in the future.
_______________________________________________________________________________________________
|
|
This is the Change Management Plan for the week of 10- 16 Dec 2010
System: Infoblox DNS
Purpose of Change: Apply software patches to Infoblox DNS systems. These patches fix a possible Denial of service bug in the current Bind version. Services Affected: DNS Risk: Security Vulnerabilities remain Roll Back Plan: Built in roll back feature Date and Time: Dec 12th 6am Outage Length: None, Redundant system Performed by: Jonathan Karras System: eWeber portal
Purpose of Change: New code to resolve on-going errors for users with the eWeber login Services Affected: eWeber portal (eweber.weber.edu) Risk: Some users are getting an error ("cp/home/next")that prevents them from using eWeber. Roll Back Plan: Change back to old code
Date and Time: Sunday, December 12, 2010 at 12:00 AM Outage Length: No outage expected Performed by: Stan Holmes System: ID Card Office, Project Tracker
Purpose of Change: Upgrade LYNX database to 11gR2 Services Affected: ID Card Office, Project Tracker Risk: Running on old software Roll Back Plan: Restore database to 10g Date and Time: 12/12/2010 12:00pm Outage Length: 6-8 hours Performed by: David Fernelius 19 Dec 2010
In conjunction with the installation of electrical meters that Facilities
Management, IT Infrastructure will be switching the Data Centers in Technology
Education to generator power. The Data Center will run on generator power from
midnight to 2 am. We do not anticipate any disruption of University Services
during this time.
_______________________________________________________________________________________________
|
|
This is an Emergency Change Management Message
System: Pinnacle Telecommunications Database
Purpose of Change: In working with Pinnacle Product Support and having them go through Pinnacle error logs they've determined that we have an internal Oracle error. Services Affected: Pinnacle is discarding the call data rather than rating and archiving it. Risk: We need Pinnacle to rate the call data so that we can bill back for long distance usage. Roll Back Plan: We are in the process of upgrading Pinnacle to 5.4.11 so that the DBA's can upgrade to Oracle 11. This may solve the problem. Also asking Pinnacle Support for other suggestions. Date and Time: Dec. 14, 2010 4:00 pm Outage Length: None
Performed by: Tricia Burton, Mark Read, Lucas Jones 19 Dec 2010
In conjunction with the installation of electrical meters that Facilities Management, IT Infrastructure will be switching the Data Centers in Technology Education to generator power. The Data Center will run on generator power from midnight to 2 am. We do not anticipate any disruption of University Services during this time. _______________________________________________________________________________________________ |
|
This is the Change Management Plan for the week of 17- 23 Dec 2010
19 Dec 2010
In conjunction with the installation of electrical meters that Facilities
Management, IT Infrastructure will be switching the Data Centers in Technology
Education to generator power. The Data Center will run on generator power from
midnight to 2 am. We do not anticipate any disruption of University Services
during this time.
I have made some changes to the Change Management Form to better inform the recipients of Change Management about the changes going on. One of the additions is information about testing the changes being implemented. Please be sure to add this information. If it is not included, I will be calling you for the information. |
|
System: Network File Shares
Purpose of Change: Move files to new SAN and add MAC user access to G and H drives Services Affected: File Access Testing: some testing on small scale compared to amount of data to be moved. Risk: Old storage failure and loss of data Roll Back Plan: temporarily reactive old SAN Date and Time: 12:00 AM 24 Dec 2010 Outage Length: 4 DAYS Performed by: Edd Ramer _______________________________________________________________________________________________________________
|
|
This Change Management has been approved for completion
during the freeze because it is an annual process that must be run for the new
year.
This is the Change Management Plan for the week of 31 Jan 2010 to 6 Jan
2011:
System: Banner Position Control, Payroll, and Employee
Self-Service
Purpose of Change: Upgrade Banner Position Control to 8.4 Upgrade Banner Payroll to 8.4 Upgrade Banner Employee Self-Service to 8.4 Upgrade Banner Payroll to 8.4.1 Upgrade Banner Employee Self-Service to 8.4.1 Services Affected: Banner Position Control, Payroll and Employee Self-Service Yes Testing: Yes, upgrades were applied to BTST over two weeks ago and approved by the Payroll Office. Risk: We will be out of compliance, these are regulatory changes for the new year. Roll Back Plan: Revert to previous versions. Date and Time: January 2, 2011 6:00 AM Outage Length: Four Hours Performed by: Mark Green __________________________________________________________________________________________________________________ |
|
This is the Change Management Plan for the week of 7-13 Jan 2011
System: Xtender
Purpose of Change: Move data from old HP MSA 1000 to Hitachi AMS 2500 Services Affected: Xtender imaging services No Testing: We do not have a development system setup to test with Risk: Service will be on old hardware Roll Back Plan: Roll back to old storage Date and Time: January 7-8 2011 Start: 9:00 PM Outage Length: 24 hours Performed by: Mark Buxton __________________________________________________________________________________________________________________ |
|
This is the Change Management Plan for the week of 14 to 20 Jan 2011
System: UC4
Purpose of Change: Apply Service Pack 4 to UC4 Services Affected: UC4 Yes Testing: We have applied this service pack to the test enviornment two times successfully. Risk: not able to upgrade UC4 to 11gR2 Roll Back Plan: Roll back service pack and restore from backups taken prior to applying the service pack Date and Time: 1/16/11 7:00 AM Outage Length: 30 minutes Performed by: Mark Green __________________________________________________________________________________________________________________ |
|
This is an Emergency Change Management Plan.
System: Pinnacle Database
Purpose of Change: After upgrading Oracle and Pinnacle the database is still discarding the call data. Services Affected: The call data is being discarded and so we're unable to bill back for long distance calls and archive call history. Yes Testing: Yes - the Pinnacle database is discarding the call data. Risk: We need to collect call data so that we can bill for long distance and archive call data. Roll Back Plan: Tricia is contacting Pinnacle customer support and letting them know that upgrading Oracle and Pinnacle did not fix this problem. Date and Time: January 18, 2011 Outage Length: Top priority issue. Performed by: Tricia Burton, Mark Read, Kyle Stoddard Change Submitted by: Tricia Burton _________________________________________________________________________________________________________________
|